1. In alignment with Vision 2047, Telangana's infrastructure approach is anchored in a three-zone framework. Which of the following are these three zones?
2. What was Telangana's total contracted power capacity in 2025-26 (as on 25 January 2026)?
3. By what percentage did Telangana's contracted power capacity increase between 2024-25 and 2025-26 (as on 25 January 2026)?
4. Including capacity under construction, to what level will Telangana's total contracted power capacity increase?
5. Of Telangana's total contracted power capacity, what percentage is fossil fuel-based?
6. Which sector accounts for the largest share of Telangana's commissioned contracted power capacity?
7. What was TGGENCO's installed capacity in 2025-26 (as on 25 January 2026)?
8. The increase in TGGENCO's installed capacity between 2023-24 and 2025-26 is entirely attributable to the commissioning of which project?
9. Under the Thermal Capacity Addition Programme, what capacity of ultra-supercritical thermal power plant is proposed at Ramagundam, replacing RTS-B?
10. Under the Solar Capacity Addition Programme, TGGENCO is establishing solar power plants aggregating to about how much capacity?
11. What is the length of EHT Lines in Telangana's transmission network, in Circuit Kilometres (CKM), as on 25 January 2026?
12. As on 1 January 2026, how many 33/11kV substations exist under Telangana's electricity distribution network?
13. What was Telangana's peak load demand in 2024-25?
14. What was the maximum daily energy consumption recorded in Telangana in 2024-25?
15. What was the total energy supplied in Telangana in 2024-25?
16. What is Telangana's per-capita electricity consumption in 2023-24?
17. What is Telangana's total contracted renewable energy capacity (including hydro), as on 25 January 2026?
18. Which source accounts for the largest share of Telangana's contracted renewable energy capacity?
19. Under the Telangana Clean & Green Energy Policy-2025, how much renewable energy capacity does the State aim to add by 2030 and by 2035?
20. Under Telangana's energy subsidy measures, what is the free power unit cap for SC and ST domestic consumers not covered under the Gruha Jyothi Scheme?