← Chapters

7. Infrastructure

118 questions
1. What is Telangana's contracted power capacity in 2025-26?
2. By what percentage did contracted power capacity grow between 2024-25 and 2025-26?
3. What will Telangana's total contracted power capacity reach including projects under construction?
4. What share of Telangana's contracted power capacity is fossil fuel-based?
5. What is the sector-wise break-up of Telangana's commissioned contracted power capacity?
6. What is TGGENCO's installed power capacity as on 25 January 2026?
7. What caused the increase in TGGENCO's installed capacity between 2023-24 and 2025-26?
8. When are the remaining two units of the Yadadri supercritical thermal power station expected to be commissioned?
9. Which existing thermal station is proposed to be replaced by a new 1×800 MW ultra-supercritical plant at Ramagundam?
10. What is TGGENCO's target capacity under its Solar Capacity Addition Programme?
11. What is the total budget investment for installing pollution control equipment (FGD units, ESPs) at KTPS Stage VII, BTPS, and YTPS?
12. How many Extra High Tension (EHT) substations does Telangana have in its transmission network?
13. How many 33/11kV substations exist in Telangana's distribution network?
14. What was the total cost of the 6 schemes proposed by TGTRANSCO and DISCOMs under the Power System Development Fund (PSDF) during 2024-25?
15. What was Telangana's peak load demand, maximum daily energy met, and total energy supplied over recent years?
16. What is Telangana's per-capita electricity consumption?
17. How did TGTRANSCO's net worth and outstanding loans change recently?
18. How many total electricity connections does Telangana have?
19. What is Telangana's total contracted renewable energy capacity (including hydro)?
20. Under the Telangana Clean & Green Energy Policy-2025, what renewable capacity targets has the State set for 2030 and 2035?